湖北农业科学 ›› 2022, Vol. 61 ›› Issue (18): 245-250.doi: 10.14088/j.cnki.issn0439-8114.2022.18.043

• 乡村振兴 • 上一篇    下一篇

乡村振兴背景下武汉市高标准农田建设绩效评价研究

董普侠1, 杜赛南2   

  1. 1.湖北工建绿色材料投资有限公司,武汉 430000;
    2.湖北大学资源环境学院,武汉 430062
  • 收稿日期:2021-03-01 出版日期:2022-09-25 发布日期:2022-10-21
  • 通讯作者: 杜赛南(1998-),女,河南平顶山人,在读硕士研究生,研究方向为国土空间规划,(电话)13308622149(电子信箱)dsnhubei@163.com。
  • 作者简介:董普侠(1982-),女,陕西宝鸡人,高级工程师,硕士,主要从事土地规划管理研究,(电话)18071104366(电子信箱)14707003@qq.com。

Study on the performance evaluation of high-standard farmland construction in Wuhan City under the background of rural revitalization

DONG Pu-xia1, DU Sai-nan2   

  1. 1. HICC Green Materials Investment Co., Ltd.,Wuhan 430000,China;
    2. School of Resources and Environment, Hubei University,Wuhan 430062,China
  • Received:2021-03-01 Online:2022-09-25 Published:2022-10-21

摘要: 以武汉市3个粮食主产区为例,选取已完成的8个典型高标准农田建设项目为样本,考虑项目的实施过程和效益,构建基于行为与结果的绩效评价指标体系,运用改进灰靶模型对高标准农田建设项目绩效进行分析评价,最后提出相关政策建议。结果表明,8个研究样本的综合靶心度值在0.596~0.798,其中黄陂区李集街白庙项目区的绩效最好,江夏区五里界“四化同步”示范镇项目区绩效最差,项目实施过程和效益绩效的评价结果与样本区的实际情况基本吻合;项目实施绩效层和效益绩效层的靶心度值分别在0.180~0.217和0.405~0.603,说明项目效益绩效的贡献率相对较大;改进后的灰靶模型弥补了传统灰靶模型的不足,在高标准农田建设绩效评价方面具有较好的实际应用价值。

关键词: 高标准农田建设, 绩效评价, 灰靶模型, 组合赋权法, 武汉市

Abstract: Taking the three major grain producing areas in Wuhan City as an example, and the completed eight typical high standard farmland construction projects as samples, this paper considered the implementation process and benefit of the project, built the performance evaluation index system based on the behavior and the results, used the improved grey target model to analyze and evaluate high-standard farmland construction project performance, and finally put forward relevant policy recommendations. The results showed that the integrated target value of eight sampls was 0.596~0.798. Baimiao project area of Liji street in Huangpi district had the best performance, and the "four modernizations synchronization" demonstration town project area of Wulijie street in Jiangxia district had the worst performance. The evaluation results of the project implementation process and the benefit performance were basically consistent with the actual situation of the sample area; the target values of project implementation performance layer and benefit performance layer were 0.180~0.217 and 0.405~0.603, respectively, which suggested that the contribution of the project benefit performance was relatively large; the improved grey target model made up for the deficiency of the old gray target model, and had certain actual application value in terms of the performance evaluation of construction of high-standard farmland.

Key words: high-standard farmland construction, performance evaluation, grey target model, combination weighting method, Wuhan City

中图分类号: